Back to top

Baku Olympic Stadium

ROSSETTI teamed with Heerim Architects as the Sports Architect on the 68,000-seat Baku Olympic Stadium project in Azerbaijan. ROSSETTI worked with Heerim to enhance the fan experience in serveral ways. The team conducted a sightline analysis to generate the best viewing experience and comply with the International Building Code to analyze and design aisle, cross aisle and egress elements. Beyond the viewing experience from the seats, ROSSETTI also advised on horizontal and vertical circulation and activities in the concourse areas, including concessions design. The Baku Olympic Stadium served as the main stadium during the opening and closing ceremonies for the 2015 European Games.